CMWSSB Complaint Analytics
Chennai Metro Water · Complaint Intelligence
Reset
Showing All depots 19 Feb 2025, 11:27 – 19 Aug 2026, 16:15
Use the Depot filter above to change scope
📈
Overall trend
45 complaints in this window
⚠️
Rising issue (last 30 days)
Sewer Main Block ▲ +2 · 100%
Open backlog
0 open / escalated · worst: 110 (0)
📍
Fastest-recurring hotspot
Valluvar Kottam High Road · Sewer Main Block ×5 · 1.38/mo
45
Total Complaints
45
Closed · 100%
0
Open / Escalated
1
Streets Affected
27
Distinct Complainants
Reporting Period
19 Feb 2025, 11:27
19 Aug 2026, 16:15
Download report: 📄 Overview PDF 📄 Street×Category PDF 📄 Recurrence PDF ⬇ Street Frequency CSV ⬇ Full data CSV

Complaints by Depot (closed vs open)

Depot Comparison

DepotTotalClosedOpenStreets
DEP 110 38 38 (100%) 0 1
DEP 113 7 7 (100%) 0 1

Complaint Categories

CSV

Monthly Trend (with 3-month average)

Status

Complaint Mode

Top Streets

View all
StreetDepotComplaintsPeople
Valluvar Kottam High Road DEP 110 38 24
Valluvar Kottam High Road DEP 113 7 4

🛠 Sewer Complaints (main block · house block · overflow)

CSV PDF
StreetDepotSewerPeople
Valluvar Kottam High Road 110 22 13
Valluvar Kottam High Road 113 5 2

🚰 Water Complaints (no supply · short supply · leaks)

CSV PDF
StreetDepotWaterPeople
Valluvar Kottam High Road 110 11 8
Valluvar Kottam High Road 113 2 2

💧 Water Pollution (pollution complaints)

CSV PDF
StreetDepotPollut.People
Valluvar Kottam High Road 110 2 2

🔁 Recurrence — how often the same issue comes back (same category · same street)

PDF
CategoryStreetDepotTimesSpan (days)Avg gap (days)Per month
Sewer Main Block Valluvar Kottam High Road 110 22 546 26 1.21
No Water Supply Valluvar Kottam High Road 110 7 158 26.4 1.33
Sewer Main Block Valluvar Kottam High Road 113 5 109 27.3 1.38
Water Leakage in Service Line / Main Line Valluvar Kottam High Road 110 4 197 65.8 0.61

Avg gap = average days between consecutive complaints of that type on that street. Lower gap / higher “per month” = a faster-recurring, unresolved problem.

🔬 Advanced Analysis

Pareto — the vital few (which categories drive most complaints)

Categories ordered by volume with their cumulative share. The highlighted rows are the smallest set that together account for ~80% of all complaints — fix these first.

CategoryCountShareCumulative
Sewer Main Block vital 27 60% 60%
No Water Supply vital 9 20% 80%
Water Leakage in Service Line / Main Line 4 8.9% 88.9%
Others 3 6.7% 95.6%
Water Pollution 2 4.4% 100%

When complaints arrive (weekday × time of day)

Load pattern across the week — darker cells are busier six-hour windows. Useful for staffing and planning proactive checks before the peak.

NightMorningAfternoonEveningTotal
Mon 5 1 6
Tue 2 1 2 5
Wed 5 5 10
Thu 2 1 3
Fri 1 4 1 6
Sat 4 3 7
Sun 2 4 2 8
Total 021186 45

Linked problems (category pairs that hit the same streets)

Pairs of issue types that recur together on the same street, ranked by the number of streets where both appear. Strong pairs point to a shared root cause worth fixing in one visit.

Problem AProblem BShared streets
Not enough overlapping complaints in this scope.