CMWSSB Complaint Analytics
Chennai Metro Water · Complaint Intelligence
Reset
Showing DEP 114 20 Feb 2025, 09:02 – 06 Sep 2026, 10:13
Use the Depot filter above to change scope
📈
Overall trend
1,404 complaints in this window
⚠️
Rising issue (last 30 days)
Sewer Main Block ▲ +6 · 14%
Open backlog
3 open / escalated · 100% closed
📍
Fastest-recurring hotspot
Quaide Millath Road · Sewer Main Block ×51 · 3.04/mo
1,404
Total Complaints
1,401
Closed · 100%
3
Open / Escalated
123
Streets Affected
658
Distinct Complainants
Reporting Period
20 Feb 2025, 09:02
06 Sep 2026, 10:13
Download report: 📄 Overview PDF 📄 Street×Category PDF 📄 Recurrence PDF ⬇ Street Frequency CSV ⬇ Full data CSV

Complaint Categories

CSV

Monthly Trend (with 3-month average)

Status

Complaint Mode

Top Streets

View all
StreetDepotComplaintsPeople
Quaide Millath Road DEP 114 62 33
Mufthi Amirullah Shahib Street DEP 114 47 11
Fakkir Sahib Street DEP 114 42 23
Bangaru Street DEP 114 41 25
Bells Road DEP 114 40 13
Asudeenkhan Street DEP 114 39 18
Buchi Babu Street DEP 114 39 8
Mohamed Abdulla 1St Street DEP 114 37 11
C.n.krishnasamy Lane DEP 114 36 7
Lalmohamed Cross Street DEP 114 35 17
John Mohammed Street DEP 114 33 12
Mayor Chitti Babu Street DEP 114 33 13

🛠 Sewer Complaints (main block · house block · overflow)

CSV PDF
StreetDepotSewerPeople
Quaide Millath Road 114 54 29
Bells Road 114 39 12
Bangaru Street 114 36 20
C.n.krishnasamy Lane 114 32 7
Lalmohamed Cross Street 114 28 11
Mayor Chitti Babu Street 114 28 9
Dowlath Khan Street 114 27 9
Fakkir Sahib Street 114 27 15
John Mohammed Street 114 26 9
Mohamed Abdulla 1St Street 114 26 8

🚰 Water Complaints (no supply · short supply · leaks)

CSV PDF
StreetDepotWaterPeople
Habibullah Shahib Cross Street 114 19 4
Buchi Babu Street 114 18 6
Asudeenkhan Street 114 12 6
Azizudeen Khan Street 114 8 4
Mohamed Abdulla 1St Street 114 7 4
Bharathi Salai (Pycrafs Road) 114 6 5
Mufthi Amirullah Shahib Street 114 5 2
Quaide Millath Road 114 5 4
Akbar Sahib Street 114 4 2
Kithbath Khan Street 114 3 3

💧 Water Pollution (pollution complaints)

CSV PDF
StreetDepotPollut.People
Mufthi Amirullah Shahib Street 114 16 1
Fakkir Sahib Street 114 13 9
Kithbath Khan Street 114 8 4
John Mohammed Street 114 7 4
Parthasarathy Naidu Street 114 6 2
Subathral Street 114 6 3
Thiruvatteeswaran Sanadhi Street 114 6 3
Mohamed Abdulla 1St Street 114 4 2
Pachaiyappan Street 114 4 2
Arumugappa Street 114 3 2

🔁 Recurrence — how often the same issue comes back (same category · same street)

PDF
CategoryStreetDepotTimesSpan (days)Avg gap (days)Per month
Sewer Main Block Quaide Millath Road 114 51 503 10.1 3.04
Sewer Main Block Bangaru Street 114 36 537 15.3 2.01
Sewer Main Block Bells Road 114 31 499 16.6 1.86
Sewer Main Block C.n.krishnasamy Lane 114 29 543 19.4 1.6
Sewer Main Block Fakkir Sahib Street 114 27 454 17.5 1.79
Sewer Main Block John Mohammed Street 114 26 487 19.5 1.6
Sewer Main Block Lalmohamed Cross Street 114 26 492 19.7 1.58
Sewer Main Block Mohamed Abdulla 1St Street 114 26 518 20.7 1.51
Sewer Main Block Dowlath Khan Street 114 24 526 22.9 1.37
Sewer Main Block Fakkir (S) 1St Lane 114 24 473 20.6 1.52
Sewer Main Block Mayor Chitti Babu Street 114 23 480 21.8 1.44
Sewer Main Block Veeraraghava Street (Big Street) 114 22 474 22.6 1.39

Avg gap = average days between consecutive complaints of that type on that street. Lower gap / higher “per month” = a faster-recurring, unresolved problem.

🔬 Advanced Analysis

Pareto — the vital few (which categories drive most complaints)

Categories ordered by volume with their cumulative share. The highlighted rows are the smallest set that together account for ~80% of all complaints — fix these first.

CategoryCountShareCumulative
Sewer Main Block vital 962 68.5% 68.5%
Water Pollution vital 124 8.8% 77.4%
No Water Supply vital 119 8.5% 85.8%
Sewer - House Block 108 7.7% 93.5%
Others 36 2.6% 96.1%
Sewer Machine Hole Open (or) Broken 18 1.3% 97.4%
Water Leakage in Service Line / Main Line 17 1.2% 98.6%
Water Short Supply 11 0.8% 99.4%
Hand Pump Repair 4 0.3% 99.6%
Street Tank Supply Not Made 2 0.1% 99.8%
New Sewer Connection Renewal 2 0.1% 99.9%
Booking Issues 1 0.1% 100%

When complaints arrive (weekday × time of day)

Load pattern across the week — darker cells are busier six-hour windows. Useful for staffing and planning proactive checks before the peak.

NightMorningAfternoonEveningTotal
Mon 3 118 92 22 235
Tue 7 94 103 31 235
Wed 3 101 70 29 203
Thu 1 107 83 29 220
Fri 1 95 78 22 196
Sat 2 87 73 21 183
Sun 62 47 23 132
Total 17664546177 1,404

Linked problems (category pairs that hit the same streets)

Pairs of issue types that recur together on the same street, ranked by the number of streets where both appear. Strong pairs point to a shared root cause worth fixing in one visit.

Problem AProblem BShared streets
Sewer - House Block Sewer Main Block 41
No Water Supply Sewer Main Block 39
Sewer Main Block Water Pollution 37
No Water Supply Sewer - House Block 26
Others Sewer Main Block 24
Sewer - House Block Water Pollution 19
No Water Supply Water Pollution 18
No Water Supply Others 13
Others Sewer - House Block 13
Others Water Pollution 13
Sewer Machine Hole Open (or) Broken Sewer Main Block 12
Sewer Main Block Water Leakage in Service Line / Main Line 11