CMWSSB Complaint Analytics
Chennai Metro Water · Complaint Intelligence
Reset
Showing DEP 126 19 Feb 2025, 12:19 – 06 Sep 2026, 17:26
Use the Depot filter above to change scope
📈
Overall trend
661 complaints in this window
⚠️
Rising issue (last 30 days)
Water Short Supply ▲ +1
Open backlog
4 open / escalated · 99% closed
📍
Fastest-recurring hotspot
Malaiyappan Street · Sewer Main Block ×12 · 2.16/mo
661
Total Complaints
657
Closed · 99%
4
Open / Escalated
87
Streets Affected
390
Distinct Complainants
Reporting Period
19 Feb 2025, 12:19
06 Sep 2026, 17:26
Download report: 📄 Overview PDF 📄 Street×Category PDF 📄 Recurrence PDF ⬇ Street Frequency CSV ⬇ Full data CSV

Complaint Categories

CSV

Monthly Trend (with 3-month average)

Status

Complaint Mode

Top Streets

View all
StreetDepotComplaintsPeople
Mari Street DEP 126 46 15
Santhome High Road DEP 126 39 30
Trustpakkam South Street DEP 126 28 16
Lazarus Church Road DEP 126 27 16
Loop Road DEP 126 26 16
Venkatakrishna Road DEP 126 23 12
4Th Trust Cross Street DEP 126 21 12
Leith Castle Middle Street DEP 126 20 5
Thiruvengadam Street DEP 126 17 10
14Th Trust Cross Street DEP 126 16 10
Devanathan Street DEP 126 15 11
Norton 3Rd Lane DEP 126 14 7

🛠 Sewer Complaints (main block · house block · overflow)

CSV PDF
StreetDepotSewerPeople
Mari Street 126 38 12
Santhome High Road 126 28 22
Lazarus Church Road 126 24 14
Loop Road 126 22 13
Leith Castle Middle Street 126 19 5
4Th Trust Cross Street 126 18 10
Trustpakkam South Street 126 18 12
Venkatakrishna Road 126 15 9
Periyapalli Street 126 14 9
Malaiyappan Street 126 13 4

🚰 Water Complaints (no supply · short supply · leaks)

CSV PDF
StreetDepotWaterPeople
Sambandam Street 126 13 8
Santhome High Road 126 8 7
Thiruvengadam Street 126 8 2
Trustpakkam South Street 126 8 7
Chandrasekaran Street 126 5 3
Vanniampathy Street 126 5 4
Venkatakrishna Road 126 5 3
3Rd Trust Cross Street 126 4 4
Loop Road 126 4 3
14Th Trust Cross Street 126 3 2

💧 Water Pollution (pollution complaints)

CSV PDF
StreetDepotPollut.People
Mari Street 126 7 4
Arunachalam Street 126 2 2
Lazarus Church Road 126 2 1
Thiruvengadam Street 126 2 2
Venkatakrishna Road 126 2 1
12Nd Trust Cross Street 126 1 1
1St Trust Main Road 126 1 1
2Nd Trust Main Road 126 1 1
Ammaniammal Street 126 1 1
Leith Castle Middle Street 126 1 1

🔁 Recurrence — how often the same issue comes back (same category · same street)

PDF
CategoryStreetDepotTimesSpan (days)Avg gap (days)Per month
Sewer Main Block Mari Street 126 30 563 19.4 1.6
Sewer Main Block Santhome High Road 126 25 529 22 1.42
Sewer Main Block Lazarus Church Road 126 23 394 17.9 1.75
Sewer Main Block Loop Road 126 21 551 27.5 1.14
Sewer Main Block Leith Castle Middle Street 126 19 532 29.6 1.07
Sewer Main Block 4Th Trust Cross Street 126 16 398 26.5 1.21
Sewer Main Block Trustpakkam South Street 126 15 519 37 0.87
Sewer Main Block Malaiyappan Street 126 12 167 15.2 2.16
Sewer Main Block Leith Castle South Street 126 11 274 27.4 1.2
Sewer Main Block Periyapalli Street 126 11 388 38.8 0.85
Sewer Main Block Venkatakrishna Road 126 10 469 52.1 0.64
Sewer Main Block 14Th Trust Cross Street 126 9 407 50.8 0.66

Avg gap = average days between consecutive complaints of that type on that street. Lower gap / higher “per month” = a faster-recurring, unresolved problem.

🔬 Advanced Analysis

Pareto — the vital few (which categories drive most complaints)

Categories ordered by volume with their cumulative share. The highlighted rows are the smallest set that together account for ~80% of all complaints — fix these first.

CategoryCountShareCumulative
Sewer Main Block vital 397 60.1% 60.1%
No Water Supply vital 99 15% 75%
Sewer - House Block vital 71 10.7% 85.8%
Water Pollution 25 3.8% 89.6%
Others 22 3.3% 92.9%
Water Short Supply 19 2.9% 95.8%
Sewer Machine Hole Open (or) Broken 11 1.7% 97.4%
Water Leakage in Service Line / Main Line 8 1.2% 98.6%
Booking Issues 4 0.6% 99.2%
New Sewer Connection Renewal 3 0.5% 99.7%
New Water Connection Renewal 1 0.2% 99.8%
Rain Water Stagnation 1 0.2% 100%

When complaints arrive (weekday × time of day)

Load pattern across the week — darker cells are busier six-hour windows. Useful for staffing and planning proactive checks before the peak.

NightMorningAfternoonEveningTotal
Mon 1 48 47 11 107
Tue 3 38 29 16 86
Wed 56 43 14 113
Thu 2 51 37 14 104
Fri 1 51 35 7 94
Sat 45 27 7 79
Sun 34 33 11 78
Total 732325180 661

Linked problems (category pairs that hit the same streets)

Pairs of issue types that recur together on the same street, ranked by the number of streets where both appear. Strong pairs point to a shared root cause worth fixing in one visit.

Problem AProblem BShared streets
Sewer - House Block Sewer Main Block 32
No Water Supply Sewer Main Block 29
No Water Supply Sewer - House Block 15
No Water Supply Others 14
Sewer Main Block Water Pollution 14
Others Sewer Main Block 13
No Water Supply Water Pollution 10
Sewer - House Block Water Pollution 10
Sewer Machine Hole Open (or) Broken Sewer Main Block 10
Sewer Main Block Water Short Supply 9
No Water Supply Water Short Supply 8
Others Sewer - House Block 8