CMWSSB Complaint Analytics
Chennai Metro Water · Complaint Intelligence
Reset
Showing DEP 125 19 Feb 2025, 12:45 – 05 Sep 2026, 15:44
Use the Depot filter above to change scope
📈
Overall trend
1,153 complaints in this window
⚠️
Rising issue (last 30 days)
Sewer Main Block ▲ +19 · 42%
Open backlog
8 open / escalated · 99% closed
📍
Fastest-recurring hotspot
Dmonte Street · Sewer Main Block ×38 · 2.29/mo
1,153
Total Complaints
1,145
Closed · 99%
8
Open / Escalated
99
Streets Affected
612
Distinct Complainants
Reporting Period
19 Feb 2025, 12:45
05 Sep 2026, 15:44
Download report: 📄 Overview PDF 📄 Street×Category PDF 📄 Recurrence PDF ⬇ Street Frequency CSV ⬇ Full data CSV

Complaint Categories

CSV

Monthly Trend (with 3-month average)

Status

Complaint Mode

Top Streets

View all
StreetDepotComplaintsPeople
Dmonte Street DEP 125 56 19
Bazaar Road DEP 125 44 21
Papanasam Sivan Salai (Palace Salai) DEP 125 40 9
Nochikuppam Slum DEP 125 38 24
Ruthar Ford Puram DEP 125 38 8
Santhome High Road DEP 125 38 27
Venkatasamy Street DEP 125 36 19
Rosary Church Street DEP 125 33 12
Paripurana Vinayagar Koil Street DEP 125 32 22
Kannilal Street DEP 125 31 10
Gomathi Narayana Street DEP 125 30 12
Nadu Street DEP 125 30 14

🛠 Sewer Complaints (main block · house block · overflow)

CSV PDF
StreetDepotSewerPeople
Dmonte Street 125 41 18
Papanasam Sivan Salai (Palace Salai) 125 37 8
Bazaar Road 125 36 20
Ruthar Ford Puram 125 36 8
Venkatasamy Street 125 34 18
Santhome High Road 125 30 21
Nochikuppam Slum 125 29 17
Gomathi Narayana Street 125 28 12
Kannilal Street 125 28 8
Paripurana Vinayagar Koil Street 125 27 19

🚰 Water Complaints (no supply · short supply · leaks)

CSV PDF
StreetDepotWaterPeople
Dmonte Street 125 14 6
Nochikuppam Nagar Slum Board, Teynampet 125 12 10
Arulanandam Street 125 11 3
Arumugam Street 125 10 5
Custain Beach Street 125 8 6
Kutchery Salai 125 8 5
Rosary Church Lane 1St Lane 125 8 3
Santhome High Road 125 8 7
Nochikuppam Slum 125 7 6
Appu 1St Street 125 6 3

💧 Water Pollution (pollution complaints)

CSV PDF
StreetDepotPollut.People
Rosary Church Street 125 10 1
Bazaar Road 125 5 4
Salai Street 125 5 4
Appu Street 125 2 1
Arulanandam Street 125 2 2
Kannilal Street 125 2 2
Karaneeswarar Pakoda Street 125 2 2
Nadu Street 125 2 1
Valleswarar Koil Street 125 2 2
Appu 1St Street 125 1 1

🔁 Recurrence — how often the same issue comes back (same category · same street)

PDF
CategoryStreetDepotTimesSpan (days)Avg gap (days)Per month
Sewer Main Block Dmonte Street 125 38 498 13.5 2.29
Sewer Main Block Bazaar Road 125 34 523 15.8 1.95
Sewer Main Block Nochikuppam Slum 125 29 542 19.4 1.6
Sewer Main Block Ruthar Ford Puram 125 28 543 20.1 1.55
Sewer Main Block Gomathi Narayana Street 125 27 507 19.5 1.6
Sewer Main Block Kannilal Street 125 27 539 20.7 1.5
Sewer Main Block Venkatasamy Street 125 26 546 21.9 1.43
Sewer Main Block Paripurana Vinayagar Koil Street 125 25 505 21.1 1.48
Sewer Main Block Santhome High Road 125 23 541 24.6 1.28
Sewer Main Block Bazaar Road 3Rd Lane 125 20 534 28.1 1.12
Sewer Main Block Nadu Street 125 20 428 22.5 1.4
Sewer Main Block Papanasam Sivan Salai (Palace Salai) 125 20 355 18.7 1.69

Avg gap = average days between consecutive complaints of that type on that street. Lower gap / higher “per month” = a faster-recurring, unresolved problem.

🔬 Advanced Analysis

Pareto — the vital few (which categories drive most complaints)

Categories ordered by volume with their cumulative share. The highlighted rows are the smallest set that together account for ~80% of all complaints — fix these first.

CategoryCountShareCumulative
Sewer Main Block vital 742 64.4% 64.4%
No Water Supply vital 153 13.3% 77.6%
Sewer - House Block vital 116 10.1% 87.7%
Water Pollution 42 3.6% 91.3%
Others 29 2.5% 93.8%
Water Short Supply 28 2.4% 96.3%
Water Leakage in Service Line / Main Line 15 1.3% 97.6%
Sewer Machine Hole Open (or) Broken 14 1.2% 98.8%
Booking Issues 6 0.5% 99.3%
New Sewer Connection Renewal 3 0.3% 99.6%
New Sewer Connection Not Yet Given 2 0.2% 99.7%
Hand Pump Repair 1 0.1% 99.8%
Street Tank Supply Not Made 1 0.1% 99.9%
Rain Water Stagnation 1 0.1% 100%

When complaints arrive (weekday × time of day)

Load pattern across the week — darker cells are busier six-hour windows. Useful for staffing and planning proactive checks before the peak.

NightMorningAfternoonEveningTotal
Mon 2 132 71 24 229
Tue 1 96 67 22 186
Wed 3 97 55 13 168
Thu 1 91 65 21 178
Fri 1 77 60 18 156
Sat 2 73 50 12 137
Sun 42 36 21 99
Total 10608404131 1,153

Linked problems (category pairs that hit the same streets)

Pairs of issue types that recur together on the same street, ranked by the number of streets where both appear. Strong pairs point to a shared root cause worth fixing in one visit.

Problem AProblem BShared streets
Sewer - House Block Sewer Main Block 43
No Water Supply Sewer Main Block 42
No Water Supply Sewer - House Block 29
Others Sewer Main Block 21
Others Sewer - House Block 18
Sewer Main Block Water Pollution 17
Sewer Main Block Water Short Supply 17
No Water Supply Water Short Supply 16
No Water Supply Others 13
No Water Supply Water Leakage in Service Line / Main Line 10
No Water Supply Water Pollution 10
Sewer - House Block Water Pollution 10