CMWSSB Complaint Analytics
Chennai Metro Water · Complaint Intelligence
Reset
Showing DEP 121 20 Feb 2025, 11:32 – 06 Sep 2026, 13:42
Use the Depot filter above to change scope
📈
Overall trend
793 complaints in this window
⚠️
Rising issue (last 30 days)
Sewer Main Block ▲ +11 · 39%
Open backlog
12 open / escalated · 98% closed
📍
Fastest-recurring hotspot
Rajasekaran Lane · Sewer Main Block ×35 · 1.91/mo
793
Total Complaints
781
Closed · 98%
12
Open / Escalated
98
Streets Affected
413
Distinct Complainants
Reporting Period
20 Feb 2025, 11:32
06 Sep 2026, 13:42
Download report: 📄 Overview PDF 📄 Street×Category PDF 📄 Recurrence PDF ⬇ Street Frequency CSV ⬇ Full data CSV

Complaint Categories

CSV

Monthly Trend (with 3-month average)

Status

Complaint Mode

Top Streets

View all
StreetDepotComplaintsPeople
Rajasekaran Lane DEP 121 38 6
Sir. P.s.sivasamy Salai DEP 121 35 19
Hamilton Bridge 2Nd Street DEP 121 34 4
Dr. Radhakrishnan Road DEP 121 31 23
Appasamy Koil Street DEP 121 26 20
Thiruveethiamman Kovil Street DEP 121 25 14
Dr.natesan Road DEP 121 24 17
Rayapet Highroad 3Rd Street (Alias) Thiru Vi Ka 3Rd Street DEP 121 23 12
Veeraperumal Street DEP 121 22 13
Avvai Shanmugam Salai (Alias) Llyods Road DEP 121 21 16
Rajasekara Road DEP 121 21 8
Dr. Radhakrishnan Road 4Th Street DEP 121 20 6

🛠 Sewer Complaints (main block · house block · overflow)

CSV PDF
StreetDepotSewerPeople
Rajasekaran Lane 121 36 6
Hamilton Bridge 2Nd Street 121 33 3
Dr.natesan Road 121 17 15
Chidhambarasamy 2Nd Street 121 16 7
Sir. P.s.sivasamy Salai 121 16 10
Dwaraga Nagar Colony 3Rd Street 121 15 8
Rayapet Highroad 3Rd Street (Alias) Thiru Vi Ka 3Rd Street 121 15 5
Veeraperumal Street 121 15 9
Pappu Masthan Durga Main Street 121 14 9
Mundakanniamman Koil Street 121 13 7

🚰 Water Complaints (no supply · short supply · leaks)

CSV PDF
StreetDepotWaterPeople
Dr. Radhakrishnan Road 121 17 15
Dr. Radhakrishnan Road 4Th Street 121 15 5
Dr. Radhakrishnan Road 9Th Street 121 14 6
Sir. P.s.sivasamy Salai 121 13 7
Appasamy Koil Street 121 11 9
Thiruveethiamman Kovil Street 121 11 6
Chandra Baugh Avenue 2Nd Street 121 9 6
Rajasekara Road 121 9 4
Balakrishnan Road 121 7 4
Veeraperumal Street 121 6 3

💧 Water Pollution (pollution complaints)

CSV PDF
StreetDepotPollut.People
Appasamy Koil Street 121 8 7
Ragavan Garden 1St Lane 121 6 2
Avvai Shanmugam Salai (Alias) Llyods Road 121 5 5
Ismail Sahib Ground Main Road 121 5 5
Ragavan Garden Main Road 121 5 1
Rayapet Highroad 3Rd Street (Alias) Thiru Vi Ka 3Rd Street 121 5 5
Mekkapuram Main Street 121 4 1
Dr.natesan Road 121 3 2
Pappu Masthan Durga Main Street 121 3 2
Thiruveethiamman Kovil Street 121 3 2

🔁 Recurrence — how often the same issue comes back (same category · same street)

PDF
CategoryStreetDepotTimesSpan (days)Avg gap (days)Per month
Sewer Main Block Rajasekaran Lane 121 35 551 16.2 1.91
Sewer Main Block Hamilton Bridge 2Nd Street 121 28 507 18.8 1.66
Sewer Main Block Chidhambarasamy 2Nd Street 121 16 510 34 0.94
Sewer Main Block Dr.natesan Road 121 16 559 37.3 0.86
Sewer Main Block Rayapet Highroad 3Rd Street (Alias) Thiru Vi Ka 3Rd Street 121 15 365 26.1 1.23
Sewer Main Block Veeraperumal Street 121 15 480 34.3 0.94
No Water Supply Dr. Radhakrishnan Road 121 14 465 35.8 0.9
No Water Supply Dr. Radhakrishnan Road 4Th Street 121 13 426 35.5 0.92
Sewer Main Block Mundakanniamman Koil Street 121 13 449 37.4 0.87
Sewer Main Block Pappu Masthan Durga Main Street 121 13 470 39.2 0.83
Sewer Main Block Sir. P.s.sivasamy Salai 121 13 504 42 0.77
Sewer Main Block Dwaraga Nagar Colony 3Rd Street 121 12 395 35.9 0.91

Avg gap = average days between consecutive complaints of that type on that street. Lower gap / higher “per month” = a faster-recurring, unresolved problem.

🔬 Advanced Analysis

Pareto — the vital few (which categories drive most complaints)

Categories ordered by volume with their cumulative share. The highlighted rows are the smallest set that together account for ~80% of all complaints — fix these first.

CategoryCountShareCumulative
Sewer Main Block vital 390 49.2% 49.2%
No Water Supply vital 194 24.5% 73.6%
Water Pollution vital 79 10% 83.6%
Sewer - House Block 46 5.8% 89.4%
Others 29 3.7% 93.1%
Water Short Supply 15 1.9% 95%
Sewer Machine Hole Open (or) Broken 14 1.8% 96.7%
Water Leakage in Service Line / Main Line 13 1.6% 98.4%
Hand Pump Repair 4 0.5% 98.9%
New Water Connection Renewal 4 0.5% 99.4%
Booking Issues 1 0.1% 99.5%
Faulty Water Meter 1 0.1% 99.6%
New Sewer Connection Not Yet Given 1 0.1% 99.7%
Unclosed Roads 1 0.1% 99.9%
New Sewer Connection Renewal 1 0.1% 100%

When complaints arrive (weekday × time of day)

Load pattern across the week — darker cells are busier six-hour windows. Useful for staffing and planning proactive checks before the peak.

NightMorningAfternoonEveningTotal
Mon 1 61 41 21 124
Tue 2 55 49 28 134
Wed 2 60 52 16 130
Thu 53 47 16 116
Fri 2 62 44 18 126
Sat 1 41 33 12 87
Sun 2 35 27 12 76
Total 10367293123 793

Linked problems (category pairs that hit the same streets)

Pairs of issue types that recur together on the same street, ranked by the number of streets where both appear. Strong pairs point to a shared root cause worth fixing in one visit.

Problem AProblem BShared streets
No Water Supply Sewer Main Block 45
Sewer Main Block Water Pollution 27
Sewer - House Block Sewer Main Block 23
No Water Supply Water Pollution 20
No Water Supply Sewer - House Block 17
No Water Supply Others 15
Others Sewer Main Block 15
Others Water Pollution 12
Sewer - House Block Water Pollution 12
No Water Supply Water Short Supply 10
Sewer Machine Hole Open (or) Broken Sewer Main Block 10
Sewer Main Block Water Short Supply 9