CMWSSB Complaint Analytics
Chennai Metro Water · Complaint Intelligence
Reset
Showing DEP 115 20 Feb 2025, 12:06 – 05 Sep 2026, 17:54
Use the Depot filter above to change scope
📈
Overall trend
1,055 complaints in this window
⚠️
Rising issue (last 30 days)
Sewer Main Block ▲ +5 · 9%
Open backlog
3 open / escalated · 100% closed
📍
Fastest-recurring hotspot
Thalayari Street · Water Pollution ×18 · 14.93/mo
1,055
Total Complaints
1,052
Closed · 100%
3
Open / Escalated
95
Streets Affected
552
Distinct Complainants
Reporting Period
20 Feb 2025, 12:06
05 Sep 2026, 17:54
Download report: 📄 Overview PDF 📄 Street×Category PDF 📄 Recurrence PDF ⬇ Street Frequency CSV ⬇ Full data CSV

Complaint Categories

CSV

Monthly Trend (with 3-month average)

Status

Complaint Mode

Top Streets

View all
StreetDepotComplaintsPeople
Muzafar Jung Bahadur Street DEP 115 65 29
Surappa Mudali Street DEP 115 50 19
R.o.b I Street DEP 115 41 16
Perumal (M) Street DEP 115 38 26
Jani Johankhan Road DEP 115 32 22
Mallan Ponnappa Mudali Street DEP 115 32 17
Koya Arunagiri 5Th Street DEP 115 29 10
Thalayari Street DEP 115 28 10
Nair Iyya Street DEP 115 27 11
Hakkim Maqdoom Ashraf Street DEP 115 26 10
Mir Bakshi Ali Street DEP 115 26 17
Peters Road DEP 115 25 12

🛠 Sewer Complaints (main block · house block · overflow)

CSV PDF
StreetDepotSewerPeople
Muzafar Jung Bahadur Street 115 59 25
Surappa Mudali Street 115 46 15
R.o.b I Street 115 37 13
Jani Johankhan Road 115 32 22
Koya Arunagiri 5Th Street 115 29 10
Perumal (M) Street 115 27 19
Mallan Ponnappa Mudali Street 115 25 14
Hakkim Maqdoom Ashraf Street 115 23 9
Mir Bakshi Ali Street 115 23 14
Peters Road 115 23 11

🚰 Water Complaints (no supply · short supply · leaks)

CSV PDF
StreetDepotWaterPeople
Mallan Ponnappa Mudali Street 115 4 3
Perumal (M) Street 115 4 4
Thirunavukarasu Street 115 4 3
Surappa Mudali Street 115 3 3
Dr. Nayamadullah Shahib Street 115 2 1
Koya Arunagiri 1St Street 115 2 2
Muzafar Jung Bahadur Street 115 2 2
Nair Iyya Street 115 2 2
R.o.b I Street 115 2 2
Whites Lane 115 2 2

💧 Water Pollution (pollution complaints)

CSV PDF
StreetDepotPollut.People
Thalayari Street 115 18 6
Koya Arunagiri 1St Street 115 11 9
Nair Varatha Street 115 6 6
Hussain Alikhan II Street 115 5 4
Nair Iyya Street 115 5 1
Perumal (M) Street 115 5 3
Dr. Besant Road 115 3 3
Gafoor Shahib 1St Lane 115 3 2
Gafoor Shahib Street 115 3 1
Koya Arunagiri 2Th Street 115 3 3

🔁 Recurrence — how often the same issue comes back (same category · same street)

PDF
CategoryStreetDepotTimesSpan (days)Avg gap (days)Per month
Sewer Main Block Muzafar Jung Bahadur Street 115 57 541 9.7 3.16
Sewer Main Block Surappa Mudali Street 115 45 539 12.3 2.5
Sewer Main Block R.o.b I Street 115 36 533 15.2 2.03
Sewer Main Block Jani Johankhan Road 115 28 536 19.8 1.57
Sewer Main Block Koya Arunagiri 5Th Street 115 28 538 19.9 1.56
Sewer Main Block Perumal (M) Street 115 24 465 20.2 1.55
Sewer Main Block Mallan Ponnappa Mudali Street 115 23 521 23.7 1.32
Sewer Main Block Hakkim Maqdoom Ashraf Street 115 22 499 23.8 1.32
Sewer Main Block Subbaraya Chetty Street 115 21 516 25.8 1.22
Sewer Main Block Jani Johankhan Iv Lane 115 20 512 27 1.17
Water Pollution Thalayari Street 115 18 36 2.1 14.93
Sewer Main Block Peters Road 115 17 535 33.5 0.95

Avg gap = average days between consecutive complaints of that type on that street. Lower gap / higher “per month” = a faster-recurring, unresolved problem.

🔬 Advanced Analysis

Pareto — the vital few (which categories drive most complaints)

Categories ordered by volume with their cumulative share. The highlighted rows are the smallest set that together account for ~80% of all complaints — fix these first.

CategoryCountShareCumulative
Sewer Main Block vital 735 69.7% 69.7%
Water Pollution vital 106 10% 79.7%
Sewer - House Block vital 93 8.8% 88.5%
No Water Supply 48 4.5% 93.1%
Others 33 3.1% 96.2%
Sewer Machine Hole Open (or) Broken 33 3.1% 99.3%
Rain Water Stagnation 4 0.4% 99.7%
Booking Issues 2 0.2% 99.9%
Hand Pump Repair 1 0.1% 100%

When complaints arrive (weekday × time of day)

Load pattern across the week — darker cells are busier six-hour windows. Useful for staffing and planning proactive checks before the peak.

NightMorningAfternoonEveningTotal
Mon 2 77 77 15 171
Tue 88 59 24 171
Wed 1 88 76 22 187
Thu 2 67 64 24 157
Fri 85 61 17 163
Sat 4 58 51 15 128
Sun 29 28 21 78
Total 9492416138 1,055

Linked problems (category pairs that hit the same streets)

Pairs of issue types that recur together on the same street, ranked by the number of streets where both appear. Strong pairs point to a shared root cause worth fixing in one visit.

Problem AProblem BShared streets
Sewer - House Block Sewer Main Block 42
Sewer Main Block Water Pollution 37
No Water Supply Sewer Main Block 29
Others Sewer Main Block 25
No Water Supply Water Pollution 24
Sewer - House Block Water Pollution 20
No Water Supply Sewer - House Block 16
Sewer Machine Hole Open (or) Broken Sewer Main Block 16
Others Sewer - House Block 15
Others Water Pollution 11
No Water Supply Others 9
Sewer - House Block Sewer Machine Hole Open (or) Broken 9