CMWSSB Complaint Analytics
Chennai Metro Water · Complaint Intelligence
Reset
Showing DEP 124 19 Feb 2025, 12:38 – 05 Sep 2026, 16:48
Use the Depot filter above to change scope
📈
Overall trend
679 complaints in this window
⚠️
Rising issue (last 30 days)
Sewer Main Block ▲ +7 · 41%
Open backlog
1 open / escalated · 100% closed
📍
Fastest-recurring hotspot
Alamelumangapuram · Sewer Main Block ×21 · 1.56/mo
679
Total Complaints
678
Closed · 100%
1
Open / Escalated
91
Streets Affected
454
Distinct Complainants
Reporting Period
19 Feb 2025, 12:38
05 Sep 2026, 16:48
Download report: 📄 Overview PDF 📄 Street×Category PDF 📄 Recurrence PDF ⬇ Street Frequency CSV ⬇ Full data CSV

Complaint Categories

CSV

Monthly Trend (with 3-month average)

Status

Complaint Mode

Top Streets

View all
StreetDepotComplaintsPeople
Kutchery Road DEP 124 40 33
Thatchi Arunachalam Street DEP 124 31 17
Alamelumangapuram DEP 124 29 18
Solaiappan Street DEP 124 27 16
Nachiyappa Street DEP 124 24 15
Mundakakanni Amman Koil Street DEP 124 23 20
Nallappan Street DEP 124 23 14
North Mada Street DEP 124 22 13
Thengur Selva Vinayakar Koil Street DEP 124 21 16
R.k. Mutt Road DEP 124 19 16
Rakkiyappa Street DEP 124 19 11
New Street DEP 124 17 12

🛠 Sewer Complaints (main block · house block · overflow)

CSV PDF
StreetDepotSewerPeople
Kutchery Road 124 33 26
Alamelumangapuram 124 26 16
Nachiyappa Street 124 21 12
Solaiappan Street 124 19 11
Rakkiyappa Street 124 18 11
North Mada Street 124 15 9
Nattu Veerachi Street 124 14 8
Ramakrishnapuram 3Rd Street 124 14 6
Thatchi Arunachalam Street 124 14 9
Mundakakanni Amman Koil Street 124 13 13

🚰 Water Complaints (no supply · short supply · leaks)

CSV PDF
StreetDepotWaterPeople
Thatchi Arunachalam Street 124 11 8
Madhavaperumal Koil Street 124 7 1
Mundakakanni Amman Koil Street 124 6 5
Solaiappan Street 124 6 3
Adam Street 124 5 4
Mandavelipakkam Street 124 5 5
Nanjunda Rao Colony 124 5 2
Viswalingapuram 2Nd Street (V.c.garden 2Nd Street) 124 5 4
Abraham Street 124 4 4
Kutchery Road 124 4 4

💧 Water Pollution (pollution complaints)

CSV PDF
StreetDepotPollut.People
Nallappan Street 124 11 6
Thengur Selva Vinayakar Koil Street 124 11 9
Srinivasa Road 124 5 3
North Mada Street 124 4 2
Abraham Street 124 3 3
Loganathan Colony 124 3 2
Sundaragramani Thottam 124 3 2
Adam Street 124 2 2
Chitrakulam South Street 124 2 1
Kabaleeswarar Koil Sannathi Street 124 2 1

🔁 Recurrence — how often the same issue comes back (same category · same street)

PDF
CategoryStreetDepotTimesSpan (days)Avg gap (days)Per month
Sewer Main Block Kutchery Road 124 22 522 24.9 1.26
Sewer Main Block Alamelumangapuram 124 21 403 20.2 1.56
Sewer Main Block Nattu Veerachi Street 124 14 327 25.1 1.28
Sewer Main Block Rakkiyappa Street 124 13 538 44.9 0.72
Sewer Main Block Solaiappan Street 124 13 444 37 0.88
Sewer Main Block Nachiyappa Street 124 12 512 46.6 0.7
Sewer Main Block R.k. Mutt Road 124 12 375 34.1 0.96
Sewer - House Block Kutchery Road 124 11 446 44.6 0.74
Water Pollution Nallappan Street 124 11 368 36.8 0.9
Water Pollution Thengur Selva Vinayakar Koil Street 124 11 415 41.5 0.8
Sewer - House Block North Mada Street 124 10 462 51.3 0.65
Sewer Main Block Shanmugam Pillai Street 124 10 479 53.3 0.63

Avg gap = average days between consecutive complaints of that type on that street. Lower gap / higher “per month” = a faster-recurring, unresolved problem.

🔬 Advanced Analysis

Pareto — the vital few (which categories drive most complaints)

Categories ordered by volume with their cumulative share. The highlighted rows are the smallest set that together account for ~80% of all complaints — fix these first.

CategoryCountShareCumulative
Sewer Main Block vital 309 45.5% 45.5%
Sewer - House Block vital 108 15.9% 61.4%
No Water Supply vital 106 15.6% 77%
Water Pollution vital 65 9.6% 86.6%
Others 28 4.1% 90.7%
Sewer Machine Hole Open (or) Broken 18 2.7% 93.4%
Water Leakage in Service Line / Main Line 14 2.1% 95.4%
Water Short Supply 14 2.1% 97.5%
Hand Pump Repair 7 1% 98.5%
New Water Connection Renewal 4 0.6% 99.1%
Booking Issues 2 0.3% 99.4%
Street Tank Supply Not Made 2 0.3% 99.7%
New Sewer Connection Renewal 1 0.1% 99.9%
Rain Water Stagnation 1 0.1% 100%

When complaints arrive (weekday × time of day)

Load pattern across the week — darker cells are busier six-hour windows. Useful for staffing and planning proactive checks before the peak.

NightMorningAfternoonEveningTotal
Mon 57 43 16 116
Tue 1 49 29 14 93
Wed 51 41 24 116
Thu 45 36 13 94
Fri 2 45 37 11 95
Sat 57 34 11 102
Sun 32 25 6 63
Total 333624595 679

Linked problems (category pairs that hit the same streets)

Pairs of issue types that recur together on the same street, ranked by the number of streets where both appear. Strong pairs point to a shared root cause worth fixing in one visit.

Problem AProblem BShared streets
No Water Supply Sewer Main Block 36
Sewer - House Block Sewer Main Block 31
No Water Supply Sewer - House Block 23
Sewer Main Block Water Pollution 22
No Water Supply Water Pollution 17
Others Sewer Main Block 16
Sewer - House Block Water Pollution 15
Sewer Machine Hole Open (or) Broken Sewer Main Block 13
No Water Supply Others 11
Others Sewer - House Block 10
Sewer Main Block Water Leakage in Service Line / Main Line 10
No Water Supply Sewer Machine Hole Open (or) Broken 9