CMWSSB Complaint Analytics
Chennai Metro Water · Complaint Intelligence
Reset
Showing DEP 120 21 Feb 2025, 09:36 – 06 Sep 2026, 12:15
Use the Depot filter above to change scope
📈
Overall trend
616 complaints in this window
⚠️
Rising issue (last 30 days)
Sewer Main Block ▲ +3 · 13%
Open backlog
1 open / escalated · 100% closed
📍
Fastest-recurring hotspot
Elephant Tank 2Nd Street · Sewer Main Block ×15 · 2.67/mo
616
Total Complaints
615
Closed · 100%
1
Open / Escalated
69
Streets Affected
310
Distinct Complainants
Reporting Period
21 Feb 2025, 09:36
06 Sep 2026, 12:15
Download report: 📄 Overview PDF 📄 Street×Category PDF 📄 Recurrence PDF ⬇ Street Frequency CSV ⬇ Full data CSV

Complaint Categories

CSV

Monthly Trend (with 3-month average)

Status

Complaint Mode

Top Streets

View all
StreetDepotComplaintsPeople
Neelam Kasha Dharka Slum DEP 120 42 12
Ram Nagar 3Rd Street DEP 120 37 13
Elephant Tank 5Th Street DEP 120 34 7
Dr. Natesan Ist Lane DEP 120 33 15
Dr.natesan Road DEP 120 29 20
Elephant Tank 2Nd Street DEP 120 23 15
Muthiah Mudali Street DEP 120 22 12
Vaikol Thotti Street DEP 120 22 4
Elephant Tank 6Th Street DEP 120 21 15
Thondakka Mackan 3Rd Lane DEP 120 21 5
Gajabathy Lala Street DEP 120 19 12
Gajapathy Iind Lane DEP 120 19 14

🛠 Sewer Complaints (main block · house block · overflow)

CSV PDF
StreetDepotSewerPeople
Neelam Kasha Dharka Slum 120 40 10
Elephant Tank 5Th Street 120 34 7
Ram Nagar 3Rd Street 120 26 9
Dr.natesan Road 120 23 14
Vaikol Thotti Street 120 22 4
Thondakka Mackan 3Rd Lane 120 19 3
Dr. Natesan Ist Lane 120 16 9
Elephant Tank 2Nd Street 120 15 13
Elephant Tank 6Th Street 120 14 10
Muthiah Mudali Street 120 14 6

🚰 Water Complaints (no supply · short supply · leaks)

CSV PDF
StreetDepotWaterPeople
Ram Nagar 3Rd Street 120 7 5
Murugappa Mudali Street 120 6 2
E Deppo Street 120 5 2
Irusappa Gramani Street 120 5 4
Ram Nagar 2Nd Street 120 4 3
Elephant Tank 2Nd Street 120 3 2
Elephant Tank 6Th Street 120 3 2
Gajapathy Iind Lane 120 3 3
Nadukuppam 3Rd Street 120 3 2
Dr.natesan Road 120 2 2

💧 Water Pollution (pollution complaints)

CSV PDF
StreetDepotPollut.People
Dr. Natesan Ist Lane 120 15 7
Gajabathy Lala Street 120 12 6
Muthiah Mudali Street 120 7 5
Thondakka Mackan 2Nd Lane 120 7 2
Gajapathy Iind Lane 120 6 5
Elephant Tank 2Nd Street 120 4 3
Elephant Tank 6Th Street 120 4 4
Irusappa Gramani Street 120 4 4
Murugappa Mudali Street 120 4 4
Ram Nagar 3Rd Street 120 4 2

🔁 Recurrence — how often the same issue comes back (same category · same street)

PDF
CategoryStreetDepotTimesSpan (days)Avg gap (days)Per month
Sewer Main Block Neelam Kasha Dharka Slum 120 40 513 13.2 2.34
Sewer Main Block Elephant Tank 5Th Street 120 32 492 15.9 1.95
Sewer Main Block Ram Nagar 3Rd Street 120 25 503 20.9 1.49
Sewer Main Block Vaikol Thotti Street 120 22 535 25.5 1.23
Sewer Main Block Thondakka Mackan 3Rd Lane 120 19 443 24.6 1.29
Sewer Main Block Dr.natesan Road 120 18 408 24 1.32
Water Pollution Dr. Natesan Ist Lane 120 15 415 29.7 1.08
Sewer Main Block Elephant Tank 2Nd Street 120 15 169 12.1 2.67
Sewer Main Block Dr. Natesan Ist Lane 120 14 522 40.2 0.8
Sewer Main Block Elephant Tank 6Th Street 120 14 436 33.5 0.96
Sewer Main Block Muthiah Mudali Street 120 13 531 44.3 0.73
Water Pollution Gajabathy Lala Street 120 12 324 29.4 1.11

Avg gap = average days between consecutive complaints of that type on that street. Lower gap / higher “per month” = a faster-recurring, unresolved problem.

🔬 Advanced Analysis

Pareto — the vital few (which categories drive most complaints)

Categories ordered by volume with their cumulative share. The highlighted rows are the smallest set that together account for ~80% of all complaints — fix these first.

CategoryCountShareCumulative
Sewer Main Block vital 384 62.3% 62.3%
Water Pollution vital 99 16.1% 78.4%
No Water Supply vital 60 9.7% 88.1%
Sewer - House Block 32 5.2% 93.3%
Others 15 2.4% 95.8%
Water Leakage in Service Line / Main Line 10 1.6% 97.4%
Hand Pump Repair 5 0.8% 98.2%
Sewer Machine Hole Open (or) Broken 4 0.6% 98.9%
Water Short Supply 3 0.5% 99.4%
New Water Connection Renewal 2 0.3% 99.7%
Street Tank Supply Not Made 1 0.2% 99.8%
New Sewer Connection Renewal 1 0.2% 100%

When complaints arrive (weekday × time of day)

Load pattern across the week — darker cells are busier six-hour windows. Useful for staffing and planning proactive checks before the peak.

NightMorningAfternoonEveningTotal
Mon 3 63 44 10 120
Tue 1 55 28 11 95
Wed 2 47 27 16 92
Thu 50 22 11 83
Fri 50 30 6 86
Sat 2 40 27 7 76
Sun 1 34 23 6 64
Total 933920167 616

Linked problems (category pairs that hit the same streets)

Pairs of issue types that recur together on the same street, ranked by the number of streets where both appear. Strong pairs point to a shared root cause worth fixing in one visit.

Problem AProblem BShared streets
No Water Supply Sewer Main Block 23
Sewer Main Block Water Pollution 23
No Water Supply Water Pollution 17
Sewer - House Block Sewer Main Block 15
No Water Supply Sewer - House Block 10
Others Sewer Main Block 10
Sewer - House Block Water Pollution 10
Others Water Pollution 9
No Water Supply Others 8
Others Sewer - House Block 6
Sewer Main Block Water Leakage in Service Line / Main Line 6
Hand Pump Repair Sewer Main Block 5