๐Ÿ’ง

Letter generator โ€” admin

Letters sent

Lr. No.Dated DepotSubject
CMWSSB/AREA IX/ DEPOT 113/ Meter Testing/2026/ 16-09-2026 113 CMWSSB โ€“ AREA IX โ€“ Depot 113 โ€“ Water Meter Testing - Regarding
meter_testing ยท saved 2026-09-16 04:54:50
Open
CMWSSB/AREA IX/ DEPOT 113/ RC/GCC/SPL/2026/ 16-09-2026 113 CMWSSB โ€“ Revised Water and Sewer Connection Scheme โ€“ Area 09 โ€“ Depot 113 โ€“ Effecting of New Water / Sewer Connection at SHAFAK HAMโ€ฆ
rc_rwsc ยท saved 2026-09-16 04:47:19
Open
CMWSSB/AREA IX/ DEPOT 113/ RC/GCC/SPL/2026/ 07-09-2026 113 CMWSSB โ€“ Area IX โ€“ Depot 113 โ€“ Sewer Main Block at Door No.55/33, Kumarappa Street โ€“ Damage to House Service Connection โ€“ Request โ€ฆ
rc_sewer_main_block ยท saved 2026-09-07 09:22:24
Open
CMWSSB/AREA IX/ DEPOT 113/ RC/GCC/SPL/2026/ 07-09-2026 113 CMWSSB โ€“ Area IX โ€“ Depot 113 โ€“ No Water Supply Complaints received from the Public โ€“ Rectification of Damaged House Service Connecโ€ฆ
rc_no_water_supply ยท saved 2026-09-07 09:21:44
Open
CMWSSB/AREA IX/ DEPOT 113/ RC/GCC/SPL/2026/ 31-08-2026 113 CMWSSB โ€“ Revised Water and Sewer Connection Scheme โ€“ Area 09 โ€“ Depot 113 โ€“ Effecting of New Water / Sewer Connection at DOOR No NEโ€ฆ
rc_rwsc ยท saved 2026-08-31 05:09:17
Open
CMWSSB/AREA IX/ DEPOT 113/ RC/GCC/SPL/2026/ 31-08-2026 113 CMWSSB โ€“ Revised Water and Sewer Connection Scheme โ€“ Area 09 โ€“ Depot 113 โ€“ Effecting of New Water / Sewer Connection at OLD NO:3 Nโ€ฆ
rc_rwsc ยท saved 2026-08-31 05:07:17
Open
CMWSSB/AREA-IX/D122/RC/HO/2026/ 28-08-2026 122 CMWSSB โ€“ Area IX โ€“ Depot 122 โ€“ AMRUT 2.0 โ€“ ________ Constituency โ€“ Enlargement of Sewer Collection System in Depot 122 in Area IX โ€ฆ
street_handover ยท saved 2026-08-28 14:54:51
Open
CMWSSB/AREA IX/ DEPOT 122/ RC/GCTP/SPL/2026/ 28-08-2026 122 CMWSSB โ€“ Area IX โ€“ Depot 122 โ€“ Leakage in Water Distribution Main at ________ (________) โ€“ Rectification Work to be carried out โ€“ โ€ฆ
tp_water_main_leak ยท saved 2026-08-28 14:27:53
Open
CMWSSB/AREA IX/ DEPOT 113/ RC/GCTP/SPL/2026/ 28-08-2026 113 CMWSSB โ€“ Area IX โ€“ Depot 113 โ€“ Leakage in Water Distribution Main at ________ (________) โ€“ Rectification Work to be carried out โ€“ โ€ฆ
tp_water_main_leak ยท saved 2026-08-28 14:12:28
Open

Lr. No. CMWSSB/AREA IX/ DEPOT 113/ RC/GCC/SPL/2026/ โ€” as it was sent

ToThe Assistant Engineer, Ward โ€“ 113, Zone โ€“ IX Greater Chennai Corporation (GCC).
SubjectCMWSSB โ€“ Area IX โ€“ Depot 113 โ€“ Sewer Main Block at Door No.55/33, Kumarappa Street โ€“ Damage to House Service Connection โ€“ Request for Road Cut Permission โ€“ Reg.
Reference(1) Sewer block complaint from the consumer
BodyWith reference to the above, a sewer main block complaint was received from the residents of Door No.55/33, Kumarappa Street in Depot 113, Area IX. While attending the above complaint using the jet rodding machine, it was noticed that the house service connection has been damaged in the road portion, and the blockage could not be cleared. The damaged portion requires immediate rectification on a war-footing basis in order to avoid sewage overflow in the above street. Hence, it is kindly requested that road cut permission may be accorded for the size 1.0 m x 1.0 m at Kumarappa Street to execute the above work. The work will be carried out by following the standard safety precautionary measures and the road will be restored to its initial condition by CMWSSB.
ClosingKindly treat this as most urgent.
SignedASSISTANT ENGINEER 113 ยท 8144930113
Close Reprinting keeps the same Lr. No. โ€” it updates this row rather than making a new one.